Design-Build and O&M Construction

Design-Build and O&M Construction

Military Construction

Military Construction

Secure Facilities

Secure Facilities

Facility Renovations

Facility Renovations

Construction Management

Construction Management

AFSEC Cyber Assurance Program

AFSEC Cyber Assurance Program

Pacific Air Force (PACAF) Virtual Desktop Infrastructure (VDI)

Pacific Air Force (PACAF) Virtual Desktop Infrastructure (VDI)

Consolidated SCADA System Installation

Consolidated SCADA System Installation

Mission Critical Operations Building Renovations, including Central Issue Facility

Mission Critical Operations Building Renovations, including Central Issue Facility

Persistent Ground Surveillance System Infrastructure Support

Persistent Ground Surveillance System Infrastructure Support

SAP Application Development

SAP Application Development

United States Army Pacific (USARPAC) Mobile Transport System (MTS) Command & Control (C2) Vehicle

United States Army Pacific (USARPAC) Mobile Transport System (MTS) Command & Control (C2) Vehicle

System Security Engineering Services (SSES)

System Security Engineering Services (SSES)

Chlorinated Solvents Investigation

Chlorinated Solvents Investigation

NAS Atlanta Underground Storage Tank (UST) Remediation

NAS Atlanta Underground Storage Tank (UST) Remediation

Asbestos and Lead Based Paint Survey

Asbestos and Lead Based Paint Survey

Upper Pinto Creek Mine Sites Engineering Evaluation/Cost Analysis (EE/CA)

Upper Pinto Creek Mine Sites Engineering Evaluation/Cost Analysis (EE/CA)

Multi-layer Cover System for TPH-Impacted Soils

Multi-layer Cover System for TPH-Impacted Soils

Vegetation Clearance of Active Ranges Utilizing Robotics Technology

Vegetation Clearance of Active Ranges Utilizing Robotics Technology

Remedial Action / Remedial Response of the Central Impact Area

Remedial Action / Remedial Response of the Central Impact Area

MMRP Remedial Investigation/Feasibility Study (RI/FS)

MMRP Remedial Investigation/Feasibility Study (RI/FS)

High Density, Time Critical UXO Clearance using Robotic Technology

High Density, Time Critical UXO Clearance using Robotic Technology

API 653 Tank Inspections and Repairs

API 653 Tank Inspections and Repairs

API 570 Pipeline and Engineering Assessment

API 570 Pipeline and Engineering Assessment

Center for Domestic Preparedness Facility Operations and Maintenance Services

Center for Domestic Preparedness Facility Operations and Maintenance Services

Contractor Logistics Support for the Joint Service Ground Mask Team

Contractor Logistics Support for the Joint Service Ground Mask Team

Expeditionary Engineering Operations Support

Expeditionary Engineering Operations Support

Expeditionary Facilities and Equipment Modernization Support

Expeditionary Facilities and Equipment Modernization Support

Emergency Management Program Support

Emergency Management Program Support